Limited to 25 Attendees Only

THE 2026 ENERGY CLIFF

The AI revolution is not hitting a valuation bubble. It is hitting a physical wall.

February 24, 2026 | Tysons Corner, Virginia

In 2024, U.S. data center capacity stood at 25 GW. By 2026, that requirement will explode to 75.8 GW. By 2035, demand will be 30 times higher than today.
While the world is “crazy” about AI chips, they have ignored the socket. Electricity is no longer a bill; it is your largest financial expense and your greatest strategic threat. In Northern Virginia, demand has already surged by 30% in a single year.
The Grid cannot save you. It takes 5 to 10 years to build a transmission line, but your computing costs are doubling every 18 months. We are facing a $700 billion investment gap in the grid, and the “Hidden Inflation” of 2026 is here: electricity prices are jumping from 12 per unit**.
In 2026, those without their own power will be “over”

The Mission

This is the only setting in the world specifically engineered for the C-suite to bypass the 5-to-10-year transmission deadlock.
We have curated a “War Room” that brings together the only people who matter in 2026: The Buyers (Hyperscalers and AI Founders) and the Winners (Nuclear operators and utilities with “extra electricity capacity”).
You are not here to network. You are here to secure the “Power Stocks” that will determine if your company survives the cliff.

The Strategic Agenda

18:00 | The Diagnosis: The 30% Virginia Surge An unfiltered briefing on the Virginia and Texas energy bottlenecks. Why the current grid adds only a few gigawatts while you need 134 GW by 2030.
19:15 | The “Nuclear Pivot”: Emulating the Giants A deep dive into why Amazon and Google have already pivoted to 960 MW and 500 MW nuclear solutions. We discuss how to secure private, “behind-the-meter” power before the $12/unit cost shock hits your P&L.
20:30 | Bridging the $700 Billion Gap Strategic negotiations with the owners of the “extra capacity.” If the biggest investment in AI is no longer the chip, how many power stocks are in your portfolio?
21:30 | The Execution Roadmap The closed-door finalization of 2026 capacity requirements. Securing your “lifeboat” before the 2026 “Hidden Inflation” takes effect

The Selection Criteria

  • This event is strictly limited to 25 C-Suite Executives managing data center infrastructures of 500 MW to 1 GW
  • Availability: By Invitation Only.
Scroll to Top